... in all segments of a healthcare system
Space Requirements: 1500 SQ FT - 2000 SQ FT
Hours / Cycle: 8 Hours
Production Per Hour: 100kg
Manpower Requirement: 7-8
Electricity Consumption: 75KW
Water Requirements: 7500
Space Requirements: 2000 SQ FT - 2500 SQ FT
Hours / Cycle: 8 Hours
Production Per Hour: 125kg
Manpower Requirement: 10-12
Electricity Consumption: 1000KW
Water Requirements: 10000
Space Requirements: 2500 SQ FT - 3000 SQ FT
Hours / Cycle: 8 Hours
Production Per Hour: 187kg
Manpower Requirement: 12-15
Electricity Consumption: 150KW
Water Requirements: 15000
Space Requirements: 3500 SQ FT - 4000 SQ FT
Hours / Cycle: 8 Hours
Production Per Hour: 250kg
Manpower Requirement: 15-17
Electricity Consumption: 200KW
Water Requirements: 20000
In a barrier concept laundry, the laundry processing area is divided as per below:
Sr. No. | Equipments Type for 2000 Kg per day plant | Equipment Type | Heating | Capacity | Qty |
---|---|---|---|---|---|
1 | Equipment 1 (Cleaning) | Barrier Washer | Electric | 50kg | 4 |
2 | Equipment 1 (Drying) | Tumble Dryer | Electric | 50kg | 2 |
3 | Equipment 1 (Ironing) | FlatWork Ironer | Electric | 650x3000 | 1 |
4 | Slucing Washer | Washer Extractor | Electric | 28kg | 1 |
5 | Utility Press | Utility presses | Electric | 1200 X 750 | 2 |
6 | STP Plant capacity | ||||
7 | Electric DP capacity | ||||
8 | Water Supply capacity | ||||
9 | Vaccum Finishing Table | 10 | |||
10 | Wash Room Trolley - spring bottom trolley | 100kg | 10 | ||
11 | Dry linen trolley | 10 | |||
12 | Dirty linen collection trolley | 3 containers | 10 | ||
13 | Dirtly Linen Transportation Trolley | 50kg | 10 | ||
14 | Mobile Table | 100kg | 2 | ||
15 | Storage Racks | 2 | |||
16 | Fresh Linen Transportation Trolleys | 10 | |||
17 | SS Srub Station with Twin Sink | 2 | |||
18 | Air Compressor | 1 | |||
19 | RO Water System | 10000 litre | 1 | ||
20 | Sewing Machine | 1 | |||
21 | Weighing Machine | 200kg | 1 |